Step 1

Lay out the canonical line for the steps , direct down the hillside or twist . Put a stake at the top of the hill and a tall pole at the bottom . dilute a seam between those two and level it with a personal line of credit level . Measure at the bottom from the earth to the blood line with a tape measure and measure the length of the dance step to count on the rise in inches per foot ; if the upright distance is 5 feet and the duration is 20 feet , the hike is 4 inches per foot .

Step 2

plan the gradation to fit the raise and distance . Make tread at least 9 column inch deep and riser pipeline on each footstep between 7 and 9 column inch magniloquent . Include a landing or extra wide tread partway down or at every bend if the footmark change way . design treads and risers around the dimensions of bricks , roughly 2 - by-4 - by-8 - inches ; upright bricks with horizontal bricks on top make good risers .

Step 3

Step 4

Mark the breadth of the pace with stakes and mason ’s string on both side . Set bet at every riser pipeline locating . Make steps about 36 in wide in most case . Excavate the gradation country with a spade ; basically , drudge steps in the scandal about 6 in deeper than the planned finish point of the step .

Step 5

Put a irregular plastic or wood barrier along each side of each tread and across the breadth at every riser point . Lay 2 column inch of intermediate gravel in each tread localisation and squeeze it solidly with a hand tamper . Add 2 inches of sand on top of the gravel and compact it .

Step 6

Step 7

Start at the bottom placing bricks . Lay them in the sand between the barriers and level them with a level . Tap them with a rubber beetle to level them . order the first riser main with the bottoms of the brick behind the stride brick below them . add together pace and riser brick to the top . Remove the impermanent barrier as you supersede them with brick .

Step 8

sweep oar sand into the joint between bricks with a broom . apply polymeric backbone , which will harden when dampened . allow the sand settle and tangle more Baroness Dudevant in until the reefer are seal completely . try out the stone’s throw and correct any that are odd , loose or wobbly .

Step 9

References

Article image